Reinforced Soil Walls and Slope Protection Measures at Statue of Unity, Gujarat

Gujarat, India | Sardar Sarovar Narmada Nigam Limited

Overview

The Statue of Unity, a flagship national project honoring Sardar Vallabhbhai Patel (‘The Iron Man of India’), is the world’s tallest statue at 182 meters. Situated on a river island on the Narmada River in Kevadiya, Gujarat, it faces the Sardar Sarovar Dam. The monument was inaugurated by the Prime Minister of India on 31 October 2018, coinciding with Patel’s 143rd birth anniversary.

TechFab contributed as a Technology Provider and Supplier, delivering TechGrid Geogrids and TechFab Metal Gabion Mattresses for slope protection, ground improvement, and reinforced soil wall systems critical to the project’s stability and longevity.

Slope Protection Works

Challenge

The Memorial and Visitors Centre (M&VC) and associated amenities were constructed on an elevated platform created atop the river bank, with a gentle, stable slope extending from the river bed. Key engineering challenges included:

  • The M&VC platform was positioned above the Highest Flood Level (HFL)
  • The access ramp could become submerged during controlled water discharge from the dam
  • High risk of severe hydraulic erosion due to:
  • Proximity to the dam outlet
  • High-velocity flow during discharge events
  • Repeated wetting and drying cycles

Solution

A composite slope protection system was implemented using:

  • TechFab Metal Gabion Mattress
  • Mesh: 10×12, Wire diameter: 2.7mm/3.7mm
  • Coating: Zinc + PVC for enhanced corrosion resistance
  • Thickness: 1.0 m, installed on 1:2 (V:H) slopes with intermediate berms
  • TechGeo PP Nonwoven Geotextile beneath the gabion layer
  • Manufactured from high-quality polypropylene staple fibers
  • Functions: Separation, filtration, and drainage
  • Prevents soil migration while permitting free water flow

This system provided a flexible, permeable, and erosion-resistant armor capable of withstanding dynamic hydraulic forces.

Ground Improvement Works

Challenge

The M&VC structures and supporting facilities were to be built on reinforced soil walls positioned over engineered fill areas created alongside the stable ramp. Critical challenges included:

  • Ensuring adequate subgrade stiffness for multi-layer compacted soil forming the ramp
  • Minimizing differential settlement under heavy structural loads
  • Providing a stable foundation for tall reinforced soil walls to be constructed above

Solution

Ground improvement was achieved using three layers of TechGrid Biaxial Geogrid:

  • Material: Biaxial geogrids made from high-tenacity, high molecular weight polyester yarn with low carboxyl end groups (<30)
  • Key properties: High tensile strength in both directions, low creep, excellent long-term durability
  • Installation configuration:
  • Vertical spacing: 500 mm between consecutive layers
  • Extension: 3.0 m forward and 5.0 m backward beyond the design reinforcement length of the overlying RS walls

This created a mechanically stabilized subgrade platform with enhanced load distribution and reduced settlement potential.

Reinforced Soil Wall Works

Challenge

The foundation level for M&VC buildings was approximately 8.0 m higher than the ramp top level, necessitating construction of tall reinforced soil (RS) walls. Additional project-specific requirements included:

  • Customized facing panel dimensions to meet architectural and aesthetic specifications
  • High-performance reinforcement to accommodate varied loading conditions across different wall heights
  • Rapid, quality-controlled construction to align with the project’s stringent timeline

Solution

Reinforced Soil Walls were constructed using an integrated system:

  • Reinforcement: TechGrid U Series Uniaxial Geogrids
  • Manufactured from high-tenacity polyester yarn (molecular weight >25,000; carboxyl end groups <30)
  • Features: High tensile strength, low creep, superior durability
  • Multiple grades deployed based on location-specific structural design
  • Facing system: Custom-designed precast concrete panels
  • TechFab engineered and supplied project-specific panel drawings matching the client’s aesthetic vision
  • Quality assurance: A project-specific construction manual was prepared and submitted to guide installation and compaction procedures

This approach delivered technical and commercial advantages over conventional retaining systems, including faster construction, cost efficiency, and design adaptability.

Project Outcome & Performance

  • High-quality geosynthetic products supplied on schedule, enabling timely project completion
  • The Statue of Unity now operates as a globally recognized landmark, attracting millions of visitors annually
  • All geosynthetic systems continue to perform as designed, with:
  • No reported erosion or slope instability during dam discharge events
  • Stable reinforced soil walls supporting critical visitor infrastructure
  • Effective long-term ground improvement with minimal settlement

Frequently Asked Questions
(FAQs)

It is a comprehensive ground engineering project for the Statue of Unity (182 m tall), the world’s tallest statue located on a river island in Kevadiya, Gujarat, facing the Sardar Sarovar Dam on the Narmada River. The work included slope protection, ground improvement, and reinforced soil (RS) wall systems to support the Memorial and Visitors Centre (M&VC) and associated infrastructure. The client is Sardar Sarovar Narmada Nigam Limited, and the monument was inaugurated on 31 October 2018.

The site presented unique challenges due to:

  • Dynamic hydraulic conditions from dam discharge, causing repeated submergence and high-velocity flow
  • High erosion risk on access ramps and sloped areas near the river bed
  • Need to construct tall RS walls (up to ~8 m height difference) over engineered fill
  • Aesthetic requirements for customized facing panels matching the monument’s grandeur
  • Stringent timeline for a flagship national project with global visibility

Conventional solutions were inadequate for the combination of hydraulic, structural, and architectural demands.

  • The M&VC platform was positioned above the Highest Flood Level (HFL), but the access ramp could become submerged during dam discharge
  • High-velocity water flow during discharge events posed severe hydraulic erosion risk
  • Repeated wetting and drying cycles accelerated soil degradation
  • Proximity to the dam outlet intensified flow turbulence

Without protection, the ramp and underlying soil could suffer catastrophic erosion, compromising visitor access and safety.

A composite armor system was installed using:

  • TechFab Metal Gabion Mattress
  • Mesh: 10×12, Wire: 2.7mm/3.7mm (Zinc + PVC coated)
  • Thickness: 1.0 m, laid on 1:2 (V:H) slopes with intermediate berms
  • TechGeo PP Nonwoven Geotextile beneath the gabion
  • Functions: Separation, filtration, drainage
  • Prevents soil migration while allowing free water passage

This system provides flexibility, permeability, and erosion resistance under dynamic hydraulic loading.

Gabion mattresses offer distinct advantages for this application:

  • Permeability: Allows water to pass through, reducing hydrostatic pressure and scour
  • Flexibility: Accommodates minor settlements without cracking
  • Durability: Zinc+PVC coating provides excellent corrosion resistance in submerged conditions
  • Ease of installation: Faster deployment compared to poured concrete
  • Environmental compatibility: Blends naturally with riverine landscapes

To stabilize the engineered fill ramp supporting the M&VC structures, three layers of TechGrid Biaxial Geogrid were installed:

  • Vertical spacing: 500 mm between layers
  • Extension: 3.0 m forward and 5.0 m backward beyond the RS wall reinforcement zone
  • Material: High-tenacity polyester yarn (molecular weight >25,000; carboxyl end groups <30)

This created a mechanically stabilized subgrade with:

  • Enhanced load distribution
  • Reduced differential settlement
  • Improved bearing capacity for overlying structures

The RS walls were to be built over compacted fill areas forming the ramp. Without reinforcement:

  • The subgrade could experience excessive settlement under structural loads
  • Differential movement between filled and natural ground could cause wall distress
  • Stiffness mismatch could reduce the effectiveness of wall reinforcement

The biaxial geogrid layers ensured a uniform, stable platform for RS wall construction.

  • Height: Foundation level for M&VC buildings was ~8.0 m higher than the ramp top
  • Aesthetics: Client required custom-sized facing panels to match the monument’s architectural vision
  • Performance: Walls needed to withstand varied loading conditions (surcharge, seismic, hydraulic)
  • Timeline: Rapid construction was essential to meet the inauguration deadline

An integrated RS wall system was deployed:

  • Reinforcement: TechGrid U Series Uniaxial Geogrids
  • High tensile strength, low creep, excellent durability
  • Multiple grades used based on location-specific structural design
  • Facing: Custom-designed precast concrete panels
  • TechFab engineered project-specific panel drawings
  • Quality control: A project-specific construction manual guided installation, compaction, and QA/QC

This approach delivered faster construction, cost efficiency, and design flexibility compared to conventional retaining walls.

TechGrid geogrids are engineered for demanding soil reinforcement applications:

  • High-tenacity polyester yarn with molecular weight >25,000
  • Low carboxyl end groups (<30) for superior hydrolysis resistance
  • Protective polymeric coating for long-term durability
  • Low creep behavior ensures sustained performance over decades
  • Proven track record in dams, highways, railways, and landmark projects
  • TechFab Metal Gabion Mattress – For hydraulic slope protection
  • TechGrid PET Biaxial Geogrid – For subgrade stabilization and ground improvement
  • TechGrid PET Uniaxial Geogrid – For reinforced soil wall reinforcement
  • TechGeo PP Nonwoven Geotextile – For separation, filtration, and drainage beneath gabions