Construction of Embankment using TFI 5200 Tape Woven Geotextile

NH-17, Calicut, Kerala, India | National Highways Authority of India (NHAI)

Overview

As part of the Calicut Bypass Phase III initiative—funded by the Ministry of Road Transport & Highways and executed by the Public Works Department (National Highways), Kerala—a 3-kilometer-long road embankment was required, with heights reaching up to 5 meters. The construction site presented extremely challenging ground conditions, consisting of old paddy fields and marshy land with very soft subgrade.

To address the complex engineering problems associated with building embankments on such soft foundations, TechFab Woven Geotextile was deployed as a key component of the ground improvement strategy.

Challenge

The soft clay deposits at the site ranged in thickness from 3 to 8 meters, raising significant concerns about embankment stability and post-construction settlements. Compounding the difficulty, the uppermost clay layer was exceptionally soft with very high water content, making it impossible to conduct normal construction operations directly on this stratum.

Removing this soft clay layer was not a practical option for several reasons:

  • Uncertain thickness: The variable depth of the soft layer made excavation planning difficult.
  • High costs and time: Excavation and removal would have been prohibitively expensive and time-consuming.
  • Environmental concerns: Disposing of the large volume of excavated material posed environmental challenges.

Given these constraints, innovative engineering techniques were needed to deliver a satisfactory and cost-effective solution.

Solution

A two-pronged approach was adopted to address the ground improvement challenges:

1. Pre-fabricated Vertical Drains (PVDs)

Pre-fabricated Vertical Drains were installed throughout the soft clay zone to accelerate consolidation. As the clay consolidated under the applied load, its shear strength increased correspondingly, ensuring adequate embankment stability. This approach also ensured that the majority of settlements occurred before pavement construction, minimizing post-construction deformation.

2. Woven Geotextile Reinforcement

As an alternative to excavating and removing the extremely soft top clay layer, a woven geotextile was employed to stabilize the subgrade. Following a thorough evaluation of required geotextile functions and properties, TechFab TPP 250—a woven polypropylene tape geotextile manufactured by TechFab — was selected for this application.

The geotextile possessed a combination of mechanical and hydraulic characteristics that made it well-suited to function as both a separator and reinforcement layer. Additionally, its 5-meter width minimized the need for overlaps during installation.

Key Functions of Techfab TPP 250 Woven Geotextile

When installed at the subgrade surface, the geotextile performed multiple critical functions:

  • Separation: It acted as a barrier between the very soft clay and the higher-quality fill material, allowing the fill to be placed without mixing with the underlying clay or causing excessive rutting.
  • Reinforcement: It supported the loads imposed by the initial lifts of embankment fill and construction traffic without inducing shear failure in the clay foundation.
  • Compaction Support: The restraint provided by the geotextile enabled proper compaction of the initial embankment fill lifts, ensuring a stable working platform for subsequent construction activities.

Project Outcome & Performance

The deployment of TechFab TPP 250 Woven Geotextile delivered an environmentally friendly solution that eliminated the need for large-scale excavation and disposal of soft clay. The project was completed successfully, achieving appreciable savings in both cost and construction time compared to conventional approaches.

Related Sectors
Related Solutions

Frequently Asked Questions
(FAQs)

The Calicut Bypass Phase III is a highway infrastructure project funded by the Ministry of Road Transport & Highways and executed by the Public Works Department (National Highways), Kerala. It includes the construction of a 3-kilometer-long road embankment with heights up to 5 meters.

The site consisted of old paddy fields and marshy land with very soft subgrade conditions, presenting extremely challenging ground conditions for embankment construction.

The primary challenges included:

  • Soft clay deposits ranging from 3 to 8 meters in thickness
  • Concerns about embankment stability and post-construction settlements
  • An exceptionally soft uppermost clay layer with very high water content
  • Inability to conduct normal construction operations on the soft stratum

Excavation and removal were not practical for three main reasons:

  • Uncertain thickness: The variable depth of the soft layer made excavation planning difficult.
  • High costs and time: Excavation and removal would have been prohibitively expensive and time-consuming.
  • Environmental concerns: Disposing of the large volume of excavated material posed significant environmental challenges.

Innovative engineering techniques were adopted to deliver a satisfactory and cost-effective solution without the need for large-scale excavation.

A two-pronged approach was adopted:

  • Installation of Pre-fabricated Vertical Drains (PVDs) to accelerate clay consolidation
  • Use of woven geotextile reinforcement to stabilize the subgrade

PVDs are drainage elements installed throughout the soft clay zone to accelerate consolidation. They provide vertical drainage paths that allow pore water to escape more quickly under applied loads, speeding up the consolidation process.

As the clay consolidated under the applied load, its shear strength increased correspondingly, ensuring adequate embankment stability. Additionally, this approach ensured that the majority of settlements occurred before pavement construction, minimizing post-construction deformation.

This geotextile possessed a combination of mechanical and hydraulic characteristics that made it well-suited to function as both a separator and reinforcement layer. Its 5-meter width also minimized the need for overlaps during installation.

The geotextile performed three critical functions:

  • Separation: Barrier between soft clay and fill material
  • Reinforcement: Support for embankment loads and construction traffic
  • Compaction Support: Enabled proper compaction of initial fill lifts

The key outcomes included:

  • Environmentally friendly solution eliminating large-scale excavation
  • No need for disposal of excavated soft clay
  • Appreciable savings in both cost and construction time
  • Successful embankment construction on extremely soft ground

Compared to conventional excavation and removal methods, this geotextile-reinforced approach achieved appreciable savings in both cost and construction time while delivering an environmentally friendly solution.

The solution eliminated the need for large-scale excavation and disposal of soft clay, avoiding the environmental challenges associated with transporting and disposing of large volumes of excavated material.

This approach demonstrates that woven geotextiles can effectively stabilize extremely soft subgrades, offering a cost-effective, time-efficient, and environmentally friendly alternative to traditional excavation methods for embankment construction on challenging ground conditions.

TechGeo PP Woven Geotextiles were used, specifically the Techfab TPP 250 Woven Polypropylene Tape Geotextile.