Home / Success Stories / Improvement of Road from SH to Kandalgaon Road ODR – 90Km 0/000 to 4/300, Tal – Karveer, Dist – Kolhapur, Maharashtra
Kolhapur, Maharashtra, India | PMGSY, Maharashtra Rural Road Development Association (MRRDA) Kolhapur
The road from the State Highway (SH) to Kandalgaon (ODR-90 km, chainage 0/000 to 4/300) in Taluka Karveer, District Kolhapur traverses terrain dominated by black cotton (BC) soil with a very low CBR value. The alignment is flanked by irrigated agricultural fields and features multiple cross-drainage structures and ponds, leading to localized erosion and water accumulation.
Due to its connectivity to a State Highway, the road experiences high vehicular traffic intensity. With the onset of the monsoon, the stretch becomes heavily waterlogged, and the combination of weak BC subgrade, moisture ingress, and heavy traffic has caused significant distress, including settlements, unevenness, and fatigue cracking.
The underlying black cotton soil contains montmorillonite clay minerals, which exhibit problematic behavior:
Designing a conventional flexible pavement over such soil would require an excessively thick crust, making the project uneconomical and material-intensive while still risking long-term performance issues.
TechFab recommended TFI-5300 Type-I, a polypropylene woven geotextile, for subgrade stabilization of the distressed BC soil stretches.
Key characteristics of TFI-5300 Type-I:
Function in the pavement:
The road was opened to traffic immediately after completion of the WBM layer. Observations over the following one month showed no visible settlement, indicating effective stabilization even under early traffic and residual moisture conditions.
Project Outcome & Performance
It is a 4.3 km rural road upgradation (ODR-90 km, Ch. 0/000 to 4/300) in Taluka Karveer, District Kolhapur, Maharashtra, executed under PMGSY for the Maharashtra Rural Road Development Association (MRRDA), Kolhapur. The road connects a State Highway (SH) to Kandalgaon and passes through black cotton (BC) soil with very low CBR, high traffic intensity, and monsoon-induced waterlogging.
The road suffered from:
Black cotton soil contains montmorillonite clay minerals, which cause:
TechFab recommended TFI-5300 Type-I, a polypropylene woven geotextile, for subgrade stabilization.
Key features:
Yes. The road was opened to traffic right after completion of the WBM layer. Monitoring over the next one month showed no visible settlement, confirming effective stabilization even under early traffic loading and residual moisture conditions.