Haryana | National Highways Authority of India (NHAI)
The Shamli–Ambala Section (NH-344GM) is a strategic component of the Bareilly–Ludhiana Economic Corridor under Bharatmala Pariyojana Phase-I. Executed on an EPC (Engineering, Procurement, and Construction) basis, this six-lane, access-controlled greenfield highway spans from Adhoya Musalmana village to Sadopur village in Ambala District, Haryana.
The corridor connects the Western Ambala Bypass with the Ambala–Chandigarh Highway, passing through key locations including Barara, Tandwal, Goga Medi, Ghaseetpur, Bihta, Khuddi, Panjokhara, and Khatoli. Designed to enhance regional connectivity, traffic efficiency, and economic growth, the project leveraged TechFab’s pavement stabilization expertise to improve structural performance and construction efficiency.
Managing construction timelines across a large greenfield alignment was a major challenge due to extensive earthwork activities, coordination across multiple project stretches, resource mobilization, and maintaining continuous construction progress while adhering to strict project schedules and quality requirements for the access-controlled highway corridor.
The project alignment encountered varying subsoil conditions across different stretches, creating challenges in maintaining pavement stability and structural integrity. Careful ground assessment, proper material selection, and suitable pavement stabilization measures were essential to achieve uniform performance, durability, and long-term reliability of the highway infrastructure.
Ensuring minimal disruption to nearby villages and local connectivity during construction was a key challenge. The project required effective traffic management, careful planning of construction activities, and coordinated execution to maintain access routes, reduce inconvenience to local communities, and ensure smooth project progress throughout the corridor.
To address these challenges while promoting sustainability, the project adopted geogrid-reinforced pavement technology instead of conventional thick granular layers.
TechFab supplied TechGrid PP3030, a biaxial polypropylene geogrid manufactured via a controlled punching and drawing process. Key functions include:
Design & Sustainability Benefits:
It is a six-lane, access-controlled greenfield highway on NH-344GM, forming part of the Bareilly–Ludhiana Economic Corridor under Bharatmala Pariyojana Phase-I. Located in Ambala District, Haryana, the corridor runs from Adhoya Musalmana village to Sadopur village, connecting the Western Ambala Bypass to the Ambala–Chandigarh Highway and passing through towns like Barara, Tandwal, Goga Medi, Ghaseetpur, Bihta, Khuddi, Panjokhara, and Khatoli.
Conventional designs relying on thick granular layers would have increased material use, cost, and construction time. The project adopted geogrid reinforcement to:
TechGrid PP3030 – Biaxial Polypropylene Geogrid
TechGrid PP Biaxial Geogrid (PP3030) – for reinforcement of granular base and subbase layers in flexible pavement.
Sector: Roads & Highways (Bharatmala – Economic Corridor)
Solution: Reinforcement of Granular Base & Subbase